Scheduler Event Timeline
Root scheduler timeline product composing presets, resource lanes, and navigation.
See the crate README for calendar vs timeline selection. and feature previews for drag, editing, and lazy loading.
- Resource-based Gantt-style timelines with zoom presets
- Applications that need preset-aware
visible_datenavigation
- Bind
events,resources, andvisible_dateas signals. - Control zoom with
preset. - Enable
SchedulerFeatures::TIMELINEinfeatures.
Events without a resource_id are not shown on the timeline.
Resource timeline
Week preset with sample planned events and density stepper.
DensityDefault
Resources
Conference Room A
Conference Room B
2024-12-29
2024-12-30
2024-12-31
2025-01-01
2025-01-02
2025-01-03
2025-01-04
Design review
Team sync
Sprint planning
Release window